Thursday 4 August 2011

Crazy topic

I guess you gonna all think I'm crazy, but that would be amazing to
merge ATP/ARUN/Order scheduling in a same tool !

Mehdi

APO and AFS Options

Hello,
 
I'm a traditional AFS consultant working exclusively in the ECC/R3
system. I've been involved several times in different discussion for
using both APO and AFS.
Stock category management is an important/major feature within the AFS
solution, as it is potentially strongly used in modules SD/MM/PP/WM/QM/
WM. When I first looked at APO, to my surprise, I discovered that such
a function was not supported by APO SNP ! With a couple of
enhancements it's possible to plug APO DP and to handle categories,
however, it was much more complex/costly in regards to SNP. Actually
SAP recommends to not use AFS categories with APO SNP.

Mehdi

Urgent query about AFS MRP run (PR: pur.group) Options

Hello all,
 
Perhaps, you have faced or still face the same problems as described
below and can tell me how you resolved it:
Our distribution center can be used by multiple purchasing depts.
working with the same materials, but different stock categories.
Hereby, the purchasing org. is (normally) the same, but they use
different purchasing groups.
MRP does generate individually pur.requisitions for each stock
category. However, the pur.group gets defaulted from the material
master (see LJ3AMF8M, FORM versorgen_eban) and is therefore the same
for all PRs per plant/material combination.
Consequently, we face difficulties to control access and daily
operation (e.g. selection) with these PRs as we have to give all
pur.depts. authorization for the pur.group of the material master.
Hereby, we can not prevent that a pur.dept. does process PRs they are
not responsible for.
As far as I know there is neither a BADI at MRP nor at PR creation
available to change the pur.group or control authorization on stock
category level.
Right now, I am thinking about a modification of the FORM-routine
above.
It would be great if I can get feedback from the group
1) if you have faced the same problem and how you have resolved it or
2) if you still face this problem so that we can address this to the
AFS team for a cont. improvement.
Many thanks in advance!

Kind regards,
Klaus Leisgang

VAS handling in MM (AFS 6.3 functionality) - knowledge sharing

Hello All,

Being on ASF 6.4 since end of last year we plan to use VAS handling in MM
later this year. During the implementation project we are facing a
significant no. of challenges.
Well, I know that some addition features will come with AFS 6.5.
Despite of, I would like to know if there is any other AFS customer out
there who has looked into this topic or even is using it already today.
It would we great if we could share our experience in this group. Ideally,
we can consolidate our lesson learned and provide constructive feedback to
AFS to further improve this function to better meet common business
requirements.
Remark: Please find below some ideas for improvements we have identified so
far.
• Mass data maintenance for vendor master is missing VAS fields
•  IDoc for vendor master creation is missing VAS fields (See screen
shot below for the VAS fields in vendor master)
• VAS data long text is not supported in sales order Idoc
• Customer master mass change function does not support VAS fields
• In Purchase order transactions ME21n, ME22n easy manual
maintenance screens for VAS codes similar to sales order (3 Tabs) is missing
(covered by AFS 6.5 in a different way)
• IDoc for customer master does not have the VAS fields (similar to
the vendor master Idoc)
• Currently, if the VAS data in PO is not from condition records,
then a PO change triggers an update termination
• Ideally, VAS data in PO should not be considered as master data.
It should be considered as transactional data, and allow for changes in PO
(for stand alone POs only)
• For TPO and PTO processes, the VAS changes made in SO should be
updated/copied to the account assigned PO without the use of texts (if PO
exists). The use of texts should be avoided (the copy function should be, if
possible , with configurable rules)

Many thanks in advance,
Klaus

SAP IM and AFS

Hello Guys,

Did anybody know if SAP IM (Invoice Management) is supported by AFS ?

Regards,
Mehdi

PIR consumption by STO

Hello,

I know it's not planned but it would be very cool to get the function
of PIR consumption (and reduction :-) by dependent requirement such as
STO.

Mehdi

AFS and WM/EWM

Hello,

Is there any chance to see EWM enhanced in future for AFS ? (I looove
WM, but EWM looks much more funny)

Mehdi

Source Allocation and quota arrangement

Hello,

Officially, quota arrangement is not fully supported by AFS as this is
a separate function, "the source allocation". I think this function
never evolved since the first releases of AFS and from what I know,
(unfortunately) no major changes (except maintenance) will be done in
future to this application. Hence, we have tow function that partially
work (quota splitting is not supported by AFS), and source allocation
is pretty...old...

I understand that new requirements went to APO, however the mid-market
still need function like this.

Mehdi

PIR Consumption

Hello,

In AFS, PIR are reduced after posting sales order goods issue. Like
most of SAP feature, PIR are plant dependent. Let's say you have two
plants (one DC and one production plant), PIR are created in the DC
and both plants have a shipping area. Then depending on the customer
ship to country, it could be interesting to ship the goods from the
production plant because you have there some available quantity. In
such a case, ATP/ARUN substitution could be used but PIR could be
never reduced due to a PGI that happens in the "wrong" plant (not the
DC).

Mehdi

AFS STO Rescheduling

Hello,

In release 6.5, AFS rescheduling was enhanced for STO, however I don't
see the benefit of getting ATP rescheduling if the MM ATP is not
redesigned, of course we don't need all SD features, but in my opinion
the current MM ATP is pretty poor and does not cover any customer
requirement in STO. Whatever you use STO for production or for central
external procurement (you receive the demand from several DC and
create one big PO on a central DC), ATP is something that all
customers require. Currently, if your PO or Prd.Order is too early or
too late in a plant then your sales order is never updated with
realistic dates.

Mehdi

MM ARUN

Hello,

Currently the MM ARUN (called during AFS background processing)
encapsulated in MJ3AVFDL_DELIVERY_POSSIBLE_MM is more technical than a
real AFS function. It would be good to make it more flexible than what
it is now. VL10B offers some functions but that's very limited, also
sometimes customers don't want to get STO & SO on the same plant for
the same sku with different rules. Customer and plant should or could
be part of the same ARUN.

I got several times this requirements and had to replace STO by PO-SO,
however this works depending on the SCM business processes and of
course if the volume is not too huge (not good to get to many IDOCs).

Mehdi

Stock/Requirement List API

Hello,

I guess we all faced the same issue. Sometimes you need to collect
data from stock/requirement list for reporting topics. A wrong
approach would be to try to select data from database and reproduce
standard calculation. This is almost impossible due to the complexity
of the current MRP design, moreover if you do that it will be more
complex to explain the calculation to the users and of course to fix
issues. The second option is to follow SAP strategy and use service/
API for this purpose.

In standard SAP, we have function module MD_*_API (sorry I don't
remember right now the exact name :-(, in AFS we have
J_3AM_DISPOSITION_DISPL. The standard one calls the AFS FM and then
performs a mapping between standard MRP element and AFS MRP element.
Standard and AFS stock/requirement list are based on those functions.
In release 6.0, view filter was added to AFS MD04, which is nice,
however from my opinion the best thing would have been to add
selection rules as this speed up a lot data processing. If you just
want to pick up supply elements (whatever the MRP status), SAP always
load everything such as demand & supply. In standard, selection rules
are filter before database selection.

Of course, I understand that this kind of changes would require an
effort in the AFS PP-MRP are.

Production time at sku group

Hello Guys,

In AFS, it's possible to define a RLT at sku group for in-house
production, this is used during ATP check. In release 6.4, an
GREAAATTTTT enhancement was done in PP, which is the support of
production version at sku group. Let's say you spend 1 day to produce
a finished goods for size XXS, and 1,5 for size XXL (maybe more true
for bags or underwear). XXL is longer to produce because you have more
components and more operations, therefore the production time also
depends on the sku group, I would have expect a field "production
time" at sku group too, currently there's only one field at material
level, which is not consistent based on all feature that exist in AFS.

Mehdi

Minimum Lot Size

Hello,

I'm back in this great group !

I'd like to talk about minimum lot size. Currently, this functionality
is supported at material and sku level which is pretty cool. Material
planning was also enhanced to support sku group, this function is very
helpfull for external procurement where multi sourcing is done at
dimension level. For instance, you have one material with two
dimensions (color & size) relevant for MRP application (see function
MRM) but you want to group PR per color because of multi-sourcing
(several vendors due to capacity, price etc...).

Here comes the issue, if you decide to run MRP at sku group level
then, there is no minimum lot size check...nor at sku, article or sku
group level...Officially, this function is not supported by SAP at sku
level, however this is not consistent from a MRP prospective,
especially with two AFS functions. It would be good to get some
enhancements in this area.

Mehdi

Sequence screen layout change in CM10, CM25, CM27 etc

I would like to change the fields displayed in the screen for adding
in sequence numbers in production orders via the planning table. Eg.
- Tcd: CM25 - Overall profile SAPCRPG002
-Mark production order and go to the Menu: Goto -> Order -> Sequence
number

Do anybody know if this can be done via customizing, programming??

Thanks in advance

Br
Linda

Stock Category Management

Greetings,

I'd like to introduce an new discussion for talking about stock
category management across SD/MM/PP/WM modules.

Mehdi

Mass update GR proccessing time in planned orders and prod Orders

Hello All.

I am facing one issue when we change in material amster the Gr
processing time and wnat it reflected in the existing planned and
production orders.
Do  you know or have some tips how can we do this mass update to the
existing planned and production orders, using a standard transaction
from SAP?.

All suguestions are welcomme.

Thansk to you all.
Best Regards
Manuel Antonio

Automatic conversion from PR to PO for direct shipment

Hello AFS Gurus,

In stantard SAP, while using direct shipment in SD (item category
TAS), it's possible to get a PR automatically converted into PO by
assigning a fixed vendor to the right place. For some technical
reason, this is not supported. If my memory is not bad, conversion
from PR to PO is done through workflow task and I don't see any "huge
technical" reasons that could explain why this was never enhanced for
AFS. Of course it's not hard to schedule ME59N or to develop an in-
house add-on for this, I (customers) would prefer to get that part of
the AFS package.

PS: Mahesh asked me to make that group active, that's what I'm trying
even if I don't have the level of knowledge that most of you have !

Regards,

Mehdi LAHMER

Batch Management

Greetings,

Let's say you decide to use a "real" batch management (activating the
right checkbox in material master, AFS MRP views) then depending on
your business requirements, you could require to get the capability to
change batch number in outbound delivery. This being not supported by
SAP (and did not want to go with modifications), I had to define in a
previous project AFS finished goods as AFS materials and raw materials
as non AFS materials.

In another project I've seen a modification to the VL* delivery
programs to handle this scenario for finished goods. I understand why
the customer did that, it did not make sence to buy IS-AFS if you
cannot run the (great) ARUN/ARUN Optimizer !

Mehdi LAHMER

Long term planning

Hello,

Did anybody think about enhancing the long term planning for AFS (even
with custom development) ? I've seen that MPS will be supported in
release 6.5, however I never heard anything regarding this topic.

I've been working for the last ten years in AFS (from 2.5 to 6.4) and
to be honest, this kind of request is pretty limited, I mean, it's
mainly required for AFS companies doing production, for others where
they mainly use purchasing/subcontracting it's not that difficult to
find a workaround with custom reports.

Mehdi LAHMER

Over picking handling in STO

Greetings,

This is my first post, please be nice with me :-) I just want to make
that group active.

I'd like to discuss about an important topic that is not yet supported
by AFS (at least till 6.4), over picking in STO processing. In the
fashion/sportswear industry, in case a real production process is
involved it's is pretty obvious that when you cut some raw materials,
sometimes you could pick more than what was assigned by the ARUN.
Right now I had to find some workaround through MM ARUN to handle that
scenario, however that is not really "elegant". The thing is, some
customers found a way to bypass that restriction by changing some
settings in the IMG and perform picking through standard picking
processing (not done in the AFS tab), thus creating, from time to
time, data inconsistencies. This was initially done by consultants
that did not know AFS restrictions.

Mehdi LAHMER

PIR's (Planned independent requirements in AFS

Hello All.

I have one issue that I would like to share with you and maybe some
good ideas to solt ve can pop up. :-)

We have one request from our business that in one specific flow we use
the planned independent requirements in order we have the forcast of
the requirement for some matrials. This forcast for a specific
material can came from several locations and we were able to found a
way to have it seperated using the requirement plan number.
Then the ordering plant will place some Production orders that we
convert in sales orders in the producing plant and we will then get
our PIR's consumed. Now my question is how can I inform the system
that if the Sales order is from one plant it should consume the PIR's
related to that plant and if it cames from the other plant it should
consumen the PIRS related to that plant.

I don't know if am clear on my explanation, but if you need any more
explanation please let me know.

Thanks in advance for your help.
Best Regards
Manuel Antonio

ARUN Release Problem

Hello Team,

I am facing a issue with release in ARUN .

1. Consider all Open sales orders with a given date range of delivery: Configured using requirement selection.
2. Customer groups are present with diferent priority: Configured using grouping by delivery priority and sorting based on grouping priority and material
3. Allocation run to happen on spread logic at SKU level: Used Allocation logic 0004 for this.
4. Sales Order release should be color wise and a material/color should be release only if 70% of requirement for the material/color in sales order is fullfilled by the allocation: Used release rule, with 70% logic incorporated at Shedule line group. In sales order we have a user exit to populate the color of the material (dimension 1) in schedule line group.

Based on the above settings, i run 2 scenarios in ARUN:

Scenario 1:

Sales Orders:
2310000131
2310000133
2310000135
2310000141
2310000142
2330000061

Material: 10P3089J0645I

Allocation Result: All SKUs for Material 10P3089J0645I in Order
2310000131 gets successfully allocated/released with status "F". Total
qty allocated is 30 Pcs.

Senario 2:

Sales Orders: (Same as in Scenatio 1)
2310000131
2310000133
2310000135
2310000141
2310000142
2330000061

Material:All material in System

Allocation result: All 30 pcs of material 10P3089J0645I in SO
2310000131 get allocated but strangely only one color gets released
with status "F" and the other color gets a reserved status "R" meaning
the release rule must have failed for it.

As the number of orders are same in both scenarios, requirement should
be same and hence the relase rule should produce the same result in
both scenarios. What is more confusing is that the release rule is
working apparently for one color and not for the other.

Regards
Subham Arya

Sales Plan Vs Actual in R/3 only not using BW

Good Evening,

1.    I have 4 business lines - Bags, Caps, Leather Goods and Accessories
2.    Each of the business lines have a Product Manager
3.    Each Product Manager have dealers who exclusively deal in each product line.
4.    At the beginining of the year I have a sales plan (per region / per dealer) and over the year sales are carried out.

I want to know where in R/3 the sales plan are input (per product per region per dealer are input)?  Is there any report already where I can see Plan Vs Actuals per region and dealer. I a don’t want to see this in BW

I am looking at a pure standard SAP solution with no customer developments. Is it feasible?

Best wishes for a very pleasant weekend....

With kindest regards & Thanks,

Narayanan P

Authorization Object - Checks

Hello Experts,

We make use of Authority checks in our applications which require User authorization .
For example Sales application makes use of Standard authorization object 'V_VBAK_VKO' .

AUTHORITY-CHECK OBJECT 'V_VBAK_VKO'
       ID 'VKORG' FIELD VBAK-VKORG
       ID 'VTWEG' FIELD VBAK-VTWEG
       ID 'SPART' FIELD VBAK-SPART
       ID 'ACTVT' FIELD DA_ACTVT.


The above check is a combination of Business fields like Sales org(VBAK-VKORG) etc and Type of a Activity (DA_ACTVT) for example '01' for create and '02' for change .

My requirement is to have pure activity based check .
Can we use the same check without Business fields and have only the Activity type . for example

AUTHORITY-CHECK OBJECT 'ZOBJ'
       ID 'ACTVT' FIELD '02'.

Syntactically seems to correct .Is this a correct usage ?

Thanks and Regards,
Ravish.

PP/MM - Return Purchase Order

Dear AFS Community,

I would like to understand how returns are handled in actual business and how return PO is used to suffice this requirement.
More importantly I would like to understand how MRP should treat this return PO. Requirement or Stock ?
Any kinds of inputs in this regard are highly appreciated.

Thanks in advance,

Regards,
Mahesh

Availability Check (Checking group) - MRP 3 View

Hello All,

I have question regarding availability check (Checking group ) – MRP3 view ( MARC-MTVFP )

What’s a fallouts or issues if you change checking group from 02 (Consider RLT )to 01 ( NO RLT) ?

Current Customer process is Fashion material – will consider normal stock, IBD, purchase order for atp calculations. So material Group is 02. After season is closed Fashion material is converted to Replenishment material ( Replenishment season is attached ).  

Currently we are thinking of changing checking group from 02(Consider RLT) to 01(No RLT) when material is changed to replenishment material.

Wanted wants to know drawbacks if we change checking group in lifecycle of material.

Thanks,
Vasant

Planned independent requirements and coverage strategies

Hello All.

I have the following scenario where I am experience some problems.
I am using Sales orders to consume planned independent requirements.
I have one sales order that generate a planned order both with
category 0010000000001 and after I create PIRs with cat RQ0 and run
MRP I got the planend order with category 001##########.
In the coverage strategy it do not allow me to define in the folder
planned independent requirements consumption the SO-R.Cat with more
then 001. My idea was to define 001********** and in the PIR RQ0 in
order requirements of SO consume PIR's.
Do you have any idea why this ####### signs appear in the planned
order after I create the PIR's and run MRP?

Best Regards
Manuel Antonio

AFS BAPI for OBD delivery


Hi,

I have kind of requirement where user want to create the Outbound
Delivery via Scanning the Tag(EAN).As VL01n is not supporting this
requirement. So we decided to go for Custom Development.
But I am facing one problem. I am working on BAPI "BAPI_OUTB_DELIVERY_CREATE_SLS" .
I am trying this BAPI to create the Partial Delivery. But it always creating
delivery for all quantity from Sales Order. Going ahead what i can see
here is It has two BADI which User can use before and after Creation of Obd
delivery. I also tried to manupulate the Quantity via this BADI's..But idea is
not working. Do we have any other BAPI/FM in AFS to create the Partial OBD
Delivery?

Regards
Subham

Procurement Type - X

Hello All,
 
I am having a doubt on exact use of procurement type "X" (Both procurement types) in MRP 2 view. When AFS MRP is executed with control parameter for ‘Create purchase req.’ as 1, I expect MRP to generate Purchase Requisition. But instead the MRP always end ups creating a planned order. Is there any way I can generate a PReq for this procurement type?
 
Regards,
Suresh Saunshi

Define "Sort dimentions Values" by default in transaction J3AH


Hello All.

In our previous version of AFS 3.0b we had the possibility to set the above field at time we were creating a AFS material grid. Now in AFS 6.3 I have tried to find the same possibility, but I am not able to find the same place in IMG to setup it. Any idea here Ican find it?

Thanks for your comments.
Manuel Antonio

Stock transport order (plant to plant) issues

Hello AFS community,

our very first discussion was touching this subject already and the
outcome was already quite helpful for me: PIR consumption by STO is
possible in SAP standard, but not in AFS. In general, it is feasible,
custom development would be required.

However, there are a few more open topics about STOs on an AFS system:
1) ARUN: As far as I know STOs are not taken into account by ARUN.
Do you face any issues with this limitation? If yes, how to you deal
with it? Any workaround?

2) ATP: I was told that the ATP result at the issuiing plant is not
correct as the demand caused by the STO is not taken into account.
Honestly, I haven't tested this yet. Could any one tell me how it
should work? When will the demand considered by ATP? Do I have to
create the DN first or even post the GI? Perhaps my ATP checking rules
are not correct... What needs to be set to consider demand by STP?
Please excuse, I am not an ATP expert.

3) We are not using vendors and pur.info records for this scenario.
Therefore, I struggle with the following 2 items:
a) Planned delivery time at PR item is taken from material master and
contains the default value for ext. procurement. Consequently, this
value is wrong for STO PRs and needs to be corrected afterwards. In
the meantime, I found BADI MD_EXT_SUP, method GET_PLIFZ. Has any one
experience with this BADI in the AFS context, would it serve my needs?
b) The confirmation control key at PO item level cannot be defaulted
for STOs with supplying plant and no vendor/info record. Is any one
aware of a BADI etc. to overcome this limitation?
Any feedback is highly appreciated!

In advance: Many thanks for your feedback!

Kind regards,
Klaus Leisgang

Multiple planned delivery time per material and plant/DC

Hello AFS community,

I am currently working on a business requirement called "Multiple
leadtime per article". In fact, the business background is that
external procurement is normally done with a (standard) planned
delivery time (PDT) of - let's say - 105 days from the vendor to our
DC. However, there is an agreement with the vendor that the PDTs of
the same material could be much shorter at the same time (e.g. 25
days) for special business models.

At a higher level, we looked already at a couple of (SAP standard)
options to tackle this requirement, but most of them have been
requested already, e.g.
- Duplication of material and maintainence of different PDTs per
material
- Duplication of plant and maintainence of different PDTs per plant

Looking at AFS, I believe that the SKU concept and in particular
categories might provide the basis for an enhancement to service our
needs. It seems obvious that ATP, MRP, PO Placement process and
masterial data are affected.

For inhouse production, AFS is already supporting "Total replenishment
lead time" on SKU level (see AFS MRP view at material master). I am
now looking for something similiar for external procurement.

Have you faced such a business requirement already and have some
idea's how to cope with it?

MM contract might be an option, but I wonder how it could influence
ATP and MRP providing expected results.

Any feedback is highly appreciated!

BTW: In this context, do you see any chance to control "Lot size" on
SKU (category) level as well?

In advance: Many thanks for your feedback!

Kind regards,
Klaus Leisgang

Consumption of planned independent requirements

Hello All.

I would like to take this opurtunity to congratualte every one for
this network.In my point of view is it a good idea.

I have one question that I would like to share with you and at same
time have your comments and input on it.

We have define some Planend independent requirements for a material by
SKU with a certain category. Then We have created a purchase order that is Plant to plant with another category.

After MRP has run it generates a planned order that I will convert
into production order and then I will produce this production order.
then my question is how do I setup the system in order my planned
independent requirements are consumed by this purchase order that is
planto to plant?

Thanks in advance for you coments.

Best Regards
Manuel